NEW QUESTION # 191
How shall tensile strength be computed?
-max load at failure x smallest cross-sect area
-Max load at failure / "
-Min load at failure x largest cross sect area
"/"
- A. The entire weld must be cut out.
- B. Tensile-strength specimens shall be subject to the nick-break test
- C. Atmosphere supplying, air purifying and self contained aparatus
- D. Divide the max load at failure with the smallest cross sectional area of the specimen
Answer: B
NEW QUESTION # 192
Define validation in terms related related to data, information and document.
- A. Confirmation, through the provisions of objective evidence, that the requirements for a specific intended use or application have been fulfilled.(The objective evidence needed for a validation is the result of a test or other form of determination such as performing alternative calculations or reviewing documents)(ISO 9000 3.8.13)
- B. Confirmation, through the provisions of objective evidence, that specified requirements have been fulfilled.(The objective evidence needed for a fair if Acacian can be the result of an inspection or of other forms of determination such as performing alternative calculations or reviewing documents)(ISO 9000 3.8.12)
- C. Document stating requirements(example quality manual, quality plan, technical drawing, procedure document, work instruction.)(ISO 9000 3.8.7)
- D. Is the entity that intends to install, operate, maintain a new pipeline that crosses existing pipeline facilities. The Crossing company may designate a third-party or parties to perform the task necessary to accomplish a Crossing but remains responsible for the work performed by such third parties.
Answer: C
NEW QUESTION # 193
Define limits placed on characteristics of materials, products, and services established by the organization to achieve conformity to the manufacturing or service requirements is the definition of?
- A. Acceptance criteria(api spec q1 3.1.1)
- B. Rework(api 1104 3.1.25)
- C. Manufacturing acceptance criteria(API Spec Q1 3.1.15
- D. Strength, spike, and leak (api 1110 4.1.7)
Answer: C
NEW QUESTION # 194
All compressed gas cylinders and tanks should be properly _______________ and ______________ when transported and stored.
- A. Permits and precautions
- B. Effectiveness
- C. Grading
- D. Secured and labeled
Answer: D
NEW QUESTION # 195
What happens if dent includes part of a weld?
- A. Strength pressure test
- B. Impressed current
- C. The entire weld must be cut out.
- D. Superimposed loads
Answer: C
NEW QUESTION # 196
Green
- A. Communication, alarm or signal lines
- B. Sewers and drain lines
- C. Potable water
- D. Proposed excavation
Answer: B
NEW QUESTION # 197
Leveling the pipeline ROW so construction can proceed smoothly
- A. Easement
- B. Pulverizing
- C. Testing
- D. Grading
Answer: A
NEW QUESTION # 198
When should hearing protection be used?
- A. Hearing protection is used when the work environment noise level exceeds 85 dbA over an 8-hour period
- B. Residence within proximity of the facility being tested, state and local enforcement agencies.(CS-S-9 4.5)
- C. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)
- D. Liquids having a flashpoint below 100°F are Known as class 1 liquids. The most common is gasoline
Answer: A
NEW QUESTION # 199
Perform these before any mechanical ground disturbance
- A. Sweep locate, pot hole, one call
- B. Identifying, documenting and oversee activity
- C. Impressed current
- D. Pressure testing
Answer: A
NEW QUESTION # 200
What type of signs need to be posted during Hydro/Pressure Testing?
- A. Adequacy, completeness and lack of conflict.
- B. Danger - High Pressure, Testing in progress
- C. Strength pressure test
- D. Required reporting
Answer: B
NEW QUESTION # 201
At a minimum, install and maintain temporary sediment barriers
across the entire construction right-of-way at the base of slopes greater than ________percent where the base of the slope is less than ________ feet from a waterbody
- A. 100 ft
- B. 12 / 120
- C. 5 / 50
- D. 10 / 100
Answer: C
NEW QUESTION # 202
A person who operates either machine or automatic welding equipment
- A. Inspector
- B. Design validation
- C. Welding engineer
- D. Welding operator
Answer: D
NEW QUESTION # 203
Work Permits for excavation would be found under what OSHA standard?
- A. Have the longitude a weld as near as practical to the neutral axis of the band(49 CFR 192.313)
- B. OSHA 1926.650 and 1926.651, (29 CFR 1926) safety and health regulations for construction
- C. OSHA 1910.109 and OSHA 1926.900 to 1926.914
- D. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)
Answer: D
NEW QUESTION # 204
The construction right-of-way width for a project shall not exceed __________ feet or that described in the FERC application unless otherwise modified by a FERC Order. However, in limited, non-wetland areas, this construction right-ofway width may be expanded by up to __________ feet without Director approval to accommodate full construction right-of-way topsoil segregation and to ensure safe construction where topographic conditions (e.g., side-slopes) or soil limitations require it. Twenty-five feet of extra construction right-of-way width may also be used in limited, non-wetland or non-forested areas for truck turn-arounds where no reasonable alternative access exists.
- A. 85 / 15
- B. 75 / 25
- C. 95 / 5
- D. 90 / 10
Answer: D
NEW QUESTION # 205
Which section outlines depth of cover for transmission lines?
- A. Subpart G 96.327
- B. 100%192.243
- C. Subpart G 192.327
- D. 100%
Answer: D
NEW QUESTION # 206
When there is a possibility of hazardous exposure to radiant energy, how far back must the head area be protected?
- A. Permits and precautions
- B. containment and secondary containment
- C. A vertical line in the back of the ears
- D. radiation-protective, semitransparent materials
Answer: C
NEW QUESTION # 207
Trench ratio for soil type A
- A. 3/4:1
- B. 5/1
- C. 1/2:1
- D. 1 1/2:1
Answer: B
NEW QUESTION # 208
List Attached C, drawing illustration Guidelines found in INGAA Foundation
- A. Strength, spike, and leak(API 1110 4.1.7
- B. Residence within proximity of the facility being tested, state and local enforcement agencies.(CS-S-9 4.5)
- C. Within 24 hours of each 0.50 inch of rainfall(FERC Upland 11.B.13)
Answer: C
NEW QUESTION # 209
On Class 1 pipe, What percentage of pipe must be NDT tested?
- A. 100%192.243
- B. 15% except off-shore
- C. 10% except off-shore
- D. 35% except off-shore
Answer: D
NEW QUESTION # 210
Slope (%) Spacing (feet)
5 - 15 ?
>15 - 30 ?
>30 ?
- A. 0
- B. 50 ft
- C. 1
- D. 2
Answer: B
NEW QUESTION # 211
Wrinkle bends are covered in what section?
- A. 0
- B. 100%192.243
- C. Subpart G 192.315
- D. 100%
Answer: C
NEW QUESTION # 212
If there is a possibility of water entering the casing for a transmission line under a railroad then the _________.
- A. Permit
- B. Clearing
- C. Impressed current
- D. Ends must be sealed
Answer: D
NEW QUESTION # 213
On systems where pipe is telescoped by _______, particular care shall be taken to ensure proper placement of pipe.
- A. Ends must be sealed
- B. grade, wall thickness or both
- C. Site Specific test procedure
- D. Valve protective caps
Answer: D