NEW QUESTION # 191
How shall tensile strength be computed?
-max load at failure x smallest cross-sect area
-Max load at failure / "
-Min load at failure x largest cross sect area
"/"

  • A. The entire weld must be cut out.
  • B. Tensile-strength specimens shall be subject to the nick-break test
  • C. Atmosphere supplying, air purifying and self contained aparatus
  • D. Divide the max load at failure with the smallest cross sectional area of the specimen

Answer: B


NEW QUESTION # 192
Define validation in terms related related to data, information and document.

  • A. Confirmation, through the provisions of objective evidence, that the requirements for a specific intended use or application have been fulfilled.(The objective evidence needed for a validation is the result of a test or other form of determination such as performing alternative calculations or reviewing documents)(ISO 9000 3.8.13)
  • B. Confirmation, through the provisions of objective evidence, that specified requirements have been fulfilled.(The objective evidence needed for a fair if Acacian can be the result of an inspection or of other forms of determination such as performing alternative calculations or reviewing documents)(ISO 9000 3.8.12)
  • C. Document stating requirements(example quality manual, quality plan, technical drawing, procedure document, work instruction.)(ISO 9000 3.8.7)
  • D. Is the entity that intends to install, operate, maintain a new pipeline that crosses existing pipeline facilities. The Crossing company may designate a third-party or parties to perform the task necessary to accomplish a Crossing but remains responsible for the work performed by such third parties.

Answer: C


NEW QUESTION # 193
Define limits placed on characteristics of materials, products, and services established by the organization to achieve conformity to the manufacturing or service requirements is the definition of?

  • A. Acceptance criteria(api spec q1 3.1.1)
  • B. Rework(api 1104 3.1.25)
  • C. Manufacturing acceptance criteria(API Spec Q1 3.1.15
  • D. Strength, spike, and leak (api 1110 4.1.7)

Answer: C


NEW QUESTION # 194
All compressed gas cylinders and tanks should be properly _______________ and ______________ when transported and stored.

  • A. Permits and precautions
  • B. Effectiveness
  • C. Grading
  • D. Secured and labeled

Answer: D


NEW QUESTION # 195
What happens if dent includes part of a weld?

  • A. Strength pressure test
  • B. Impressed current
  • C. The entire weld must be cut out.
  • D. Superimposed loads

Answer: C


NEW QUESTION # 196
Green

  • A. Communication, alarm or signal lines
  • B. Sewers and drain lines
  • C. Potable water
  • D. Proposed excavation

Answer: B


NEW QUESTION # 197
Leveling the pipeline ROW so construction can proceed smoothly

  • A. Easement
  • B. Pulverizing
  • C. Testing
  • D. Grading

Answer: A


NEW QUESTION # 198
When should hearing protection be used?

  • A. Hearing protection is used when the work environment noise level exceeds 85 dbA over an 8-hour period
  • B. Residence within proximity of the facility being tested, state and local enforcement agencies.(CS-S-9 4.5)
  • C. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)
  • D. Liquids having a flashpoint below 100°F are Known as class 1 liquids. The most common is gasoline

Answer: A


NEW QUESTION # 199
Perform these before any mechanical ground disturbance

  • A. Sweep locate, pot hole, one call
  • B. Identifying, documenting and oversee activity
  • C. Impressed current
  • D. Pressure testing

Answer: A


NEW QUESTION # 200
What type of signs need to be posted during Hydro/Pressure Testing?

  • A. Adequacy, completeness and lack of conflict.
  • B. Danger - High Pressure, Testing in progress
  • C. Strength pressure test
  • D. Required reporting

Answer: B


NEW QUESTION # 201
At a minimum, install and maintain temporary sediment barriers
across the entire construction right-of-way at the base of slopes greater than ________percent where the base of the slope is less than ________ feet from a waterbody

  • A. 100 ft
  • B. 12 / 120
  • C. 5 / 50
  • D. 10 / 100

Answer: C


NEW QUESTION # 202
A person who operates either machine or automatic welding equipment

  • A. Inspector
  • B. Design validation
  • C. Welding engineer
  • D. Welding operator

Answer: D


NEW QUESTION # 203
Work Permits for excavation would be found under what OSHA standard?

  • A. Have the longitude a weld as near as practical to the neutral axis of the band(49 CFR 192.313)
  • B. OSHA 1926.650 and 1926.651, (29 CFR 1926) safety and health regulations for construction
  • C. OSHA 1910.109 and OSHA 1926.900 to 1926.914
  • D. Part of quality management focused on fulfilling quality requirements(ISO 9000 3.3.7)

Answer: D


NEW QUESTION # 204
The construction right-of-way width for a project shall not exceed __________ feet or that described in the FERC application unless otherwise modified by a FERC Order. However, in limited, non-wetland areas, this construction right-ofway width may be expanded by up to __________ feet without Director approval to accommodate full construction right-of-way topsoil segregation and to ensure safe construction where topographic conditions (e.g., side-slopes) or soil limitations require it. Twenty-five feet of extra construction right-of-way width may also be used in limited, non-wetland or non-forested areas for truck turn-arounds where no reasonable alternative access exists.

  • A. 85 / 15
  • B. 75 / 25
  • C. 95 / 5
  • D. 90 / 10

Answer: D


NEW QUESTION # 205
Which section outlines depth of cover for transmission lines?

  • A. Subpart G 96.327
  • B. 100%192.243
  • C. Subpart G 192.327
  • D. 100%

Answer: D


NEW QUESTION # 206
When there is a possibility of hazardous exposure to radiant energy, how far back must the head area be protected?

  • A. Permits and precautions
  • B. containment and secondary containment
  • C. A vertical line in the back of the ears
  • D. radiation-protective, semitransparent materials

Answer: C


NEW QUESTION # 207
Trench ratio for soil type A

  • A. 3/4:1
  • B. 5/1
  • C. 1/2:1
  • D. 1 1/2:1

Answer: B


NEW QUESTION # 208
List Attached C, drawing illustration Guidelines found in INGAA Foundation

  • A. Strength, spike, and leak(API 1110 4.1.7
  • B. Residence within proximity of the facility being tested, state and local enforcement agencies.(CS-S-9 4.5)
  • C. Within 24 hours of each 0.50 inch of rainfall(FERC Upland 11.B.13)

Answer: C


NEW QUESTION # 209
On Class 1 pipe, What percentage of pipe must be NDT tested?

  • A. 100%192.243
  • B. 15% except off-shore
  • C. 10% except off-shore
  • D. 35% except off-shore

Answer: D


NEW QUESTION # 210
Slope (%) Spacing (feet)
5 - 15 ?
>15 - 30 ?
>30 ?

  • A. 0
  • B. 50 ft
  • C. 1
  • D. 2

Answer: B


NEW QUESTION # 211
Wrinkle bends are covered in what section?

  • A. 0
  • B. 100%192.243
  • C. Subpart G 192.315
  • D. 100%

Answer: C


NEW QUESTION # 212
If there is a possibility of water entering the casing for a transmission line under a railroad then the _________.

  • A. Permit
  • B. Clearing
  • C. Impressed current
  • D. Ends must be sealed

Answer: D


NEW QUESTION # 213
On systems where pipe is telescoped by _______, particular care shall be taken to ensure proper placement of pipe.

  • A. Ends must be sealed
  • B. grade, wall thickness or both
  • C. Site Specific test procedure
  • D. Valve protective caps

Answer: D


NEW QUESTION # 214
......