
[Nov 05, 2021] Valid CTAL-TAE Test Answers & CTAL-TAE Exam PDF
Valid iSQI Advanced Level Test Automation Engineer CTAL-TAE Dumps Ensure Your Passing
ISQI CTAL-TAE Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|
| Topic 9 |
|
NEW QUESTION 11
Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?
- A. It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT
- B. It allows specify test cases without being closely tied to the tool to run them against the SUT
- C. It allows developing steps of the test process without being closely tied to the SUT interface.
- D. It allows testers to find more defects on the SUT
Answer: D
NEW QUESTION 12
Which of the following is NOT a technical design consideration for a TAA?
- A. The number of users for the SUT
- B. Standards and Legal requirements, e.g data privacy
- C. Data used by the SUT, e.g configuration, users
- D. Availability of interfaces for the SUT to be testable
Answer: A
NEW QUESTION 13
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?
- A. Summary of the test execution results
- B. Defect clusters identified during test execution
- C. Environment in which the tests have been executed
- D. System/Application under test and its version
Answer: A
NEW QUESTION 14
A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have beenasked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).
What could be the MOST problematic for this TAS?
- A. Sustainability of the automated environment
- B. Frequency ofuse
- C. Maturity of the test process
- D. Complexity to automate
Answer: A
NEW QUESTION 15
Which of the following statements about the reuse of TAS artefacts is TRUE?
- A. Reusable TAS artefacts can include components (or parts of components) associated with different layers of the TAA
- B. To enable reuse of TAS artefacts, a good design for reuse is built into the TAA and to further action are needed during the TAS lifecycle
- C. Communications maintenance and improvements for reusing TAS artefacts are modify addressed during the design of the TAA
- D. Reusable TAS artifacts associated with the definition layer of the TAA include the adaptors to the SUT components and/or interfaces
Answer: A
NEW QUESTION 16
A SUT has an existing automated test suite.
Which of the following statements relating to the introduction of new features in the SUT is TRUE?
- A. Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort
- B. The introduction of a new feature could require updates or additions to the testware components
- C. It is generally more difficult to automate test cases for a new feature as the development has not yet started
- D. The test automation engineer should work with the business analysts to ensure the new feature is testable
Answer: B
NEW QUESTION 17
You are working on a TAS forstandaloneapplication. The automated tests are developed based on a automation framework that allows interaction with GUI elements using on object orientated API. The GUI elements includemenus, buttons, radio buttons, text toolbars and their properties.
Whilst automating a test, you have discovered that the GUI elements of some third party components are not identifiable by the automated tool you are using.
Which of the following is the FIRST step that you take to investigate this issue?
- A. Adopt an approach that uses the coordinates of the GUI elements instead
- B. Verify the testability support with the providers of the third party components
- C. Verify whether the GUI identification depends on the browser.
- D. Verify whether naming standards for variables and have been defined for the current automation solution
Answer: A
NEW QUESTION 18
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automationregimefor the tests is not yet mature.
Which of the following statements is TRUE?
- A. The approach used for deployed this tool is aligned to the standard success factor for deployment
- B. The pilot project should have been critical so that maximum benefits were delivered
- C. The test process should be radically changed to gain additional benefits from using the tool.
- D. The target defined for the project was inappropriate, because the automationregimeforthe automated tests at the end of the pilot is not yet mature.
Answer: C
NEW QUESTION 19
Which of the following metrics could suggest, under certain condition that an automated regression test suite has NOT been updated for new functionalities added to the SUT?
- A. The defect density in the automation code of the regression test suite.
- B. The ratio of commands to executable statements in the automation code of the regression test suite
- C. The SUT code coverage provided by the execution of the regression test suite.
- D. The ratio of comments to executable statements in the SUT code.
Answer: C
NEW QUESTION 20
Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.
Which of the following is NOT a relevant check for achieving your goal in this scenario?
- A. Checking whether all the test cases produce repeatable outcomes
- B. Checking whether all the test cases contain the expected results
- C. Checking whether the post condition have been fulfilled for all the test cases
- D. Checking whether theloading of the TAS is repeatable in the SUT environment
Answer: A
NEW QUESTION 21
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?
- A. The ability of the SUT to prevent unauthorized access to its components or data.
- B. The abilityto identify states, outputs, intermediate result and error messages in the SUT
- C. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
- D. The ability of the SUTto perform its intended function for a specified period of time
Answer: B
NEW QUESTION 22
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?
- A. The automated test cases will not contain the expected result
- B. False alarms, that are unlikely to occur inthe real world, will be observed during testing
- C. The process of configuring the TAS will be error-phone due to manual intervention
- D. The connectivityfrom the TAS to the dedicated test interfaces will not work
Answer: B
NEW QUESTION 23
Consider a TAS deployed into production. The SUT is a web application and the test suite consists of a set of automated regression tests developed via GUI. A keyword-driven framework has been adopted for automating the regression tests. The tests are based on identification at low-levels of the web page components (e.g class indexes, tab sequence indexes and coordinates) in the next planned release the SUT will be subject to significant corrective maintenance (bug-fixes) and evolution (new features) Maintenance costs to update the test scripts should be as low as possible and the scripts must be highly reusable.
Which of the following statements is most likely to be TRUE?
- A. The keyword-driven framework introduces a level abstraction that is too high and makes it difficult what really happens
- B. The keyword-driven framework is not suitable, it would be better to adopt a structured-scripting approach
- C. False positive errors are likely to occur when running the automated tests on the new releases without modifying the test
- D. The total execution time of the automated regression test suite will decrease for each planned release.
Answer: B
NEW QUESTION 24
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?
- A. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
- B. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.
- C. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
- D. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
Answer: D
NEW QUESTION 25
Which of the following success factors for a test automation project is TRUE?
- A. Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite
- B. Automated tests must be designed to capture only the data that is strictly needed for comparing expected and actual results
- C. The test cases to be automated first must always be selected based on the number of times a test will need to be run
- D. The test cases to be automated must have a high dependency on particular data values
Answer: A
NEW QUESTION 26
A regression test suite consist of 500 test cases which are all executed manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lasted one month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?
- A. The project selected for the pilot is too critical -if should not be too critical or too trivial
- B. Thetarget defined for the business case seems difficult to hit - it should be realistic
- C. The duration of the pilot project was too short -it should last unit the success factors are achieved
- D. The target defined for the business case is too accurate -it should not be measureable
Answer: B
NEW QUESTION 27
Consider a TAS associated to dynamically changing software frequent releases. Your goal is todetermine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?
- A. The time it takes to execute all the automated tests, for each new release of the SUT.
- B. The number of automated tests which fail because of a single software defect, for each new release of the SUT
- C. The code coverage achieved with the automated tests,for each new release of the SUT
- D. The number ofautomated tests requiring maintenance, for each new release of the SUT.
Answer: B
NEW QUESTION 28
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements is TRUE?
- A. The test process should be radically changed to gain additional benefits from using the tool.
- B. The approach used for deployed this tool is aligned to the standard success factor for deployment
- C. The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.
- D. The pilot project should have been critical so that maximum benefits were delivered
Answer: B
NEW QUESTION 29
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?
- A. Adopting a test definition strategy based on classification tree coverage for the test definition layer.
- B. Looking for tools that allow performing setup and teardown of the test suites and the SUT.
- C. Looking for tools that allows direct denoting of exceptions and actions depending on the SUT events.
- D. Adopting a test definition strategy based on use case/exception case coverage for the definition layer.
Answer: B
NEW QUESTION 30
Which of the following metrics could suggest, under certain condition that an automated regression test suite has NOT been updated for new functionalities added to the SUT?
- A. The defect density in the automation code of the regression test suite.
- B. The ratio of commands to executable statements in the automation code of the regression test suite
- C. The SUT code coverage provided by the execution of the regression test suite.
- D. The ratio of comments to executable statements in the SUT code.
Answer: A
NEW QUESTION 31
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?
- A. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite
- B. Verify the behavior of the whole automated test suite by running all the automated tests
- C. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify its behavior
- D. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.
Answer: A
NEW QUESTION 32
Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?
- A. Verify the behavior of the whole automated test suite by running all the automated tests
- B. Verify the behavior of the automated tests by running a small tests, then gradually run the remaining tests to confirm the correct functioning of the whole automated test suite.
- C. Make sure that the infrastructure team has completed installing the service pack on the machines where SUT is running, then run the whole automated test suite to verify itsbehavior
- D. Do not run any tests because you can immediately confirm the correct functioning of the automated test suite
Answer: B
NEW QUESTION 33
What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?
- A. Complexity to automate the manual test cases
- B. Correctness of test data and test cases
- C. The controllability of the SUT
- D. The look and feel of the SUT
Answer: C
NEW QUESTION 34
Consider thefollowing example of TAS metrics.
Time to execute automated tests
Speed and efficiency of TAS components
Which of the following statements is TRUE?
- A. A and b are both external TAS metric
- B. A and B are both internal TAS metrics
- C. A is an internal TAS metric and B is an external TAS metric
- D. A is and external TAS metric and b is an internal TAS metric
Answer: D
NEW QUESTION 35
You have been asked to automate a set of functional tests at system Test level via the CLI of the SUT for the first release of a software system. The automated tests will be delivered to the learn in change of maintenance testing, who will use them for part of the regression testing. They have the following requirements.
1.The automated tests must be as fast and cheap to maintain as possible
2.The cost of adding new automated tests must be as low as possible
3.The automated tests must have a high level of independence from the tool itself Which of the following scripting techniques would be MOST suitable?
- A. Data-driven scripting
- B. Linear scripting
- C. Structure scripting
- D. Keyword-driven scripting
Answer: C
NEW QUESTION 36
......
CTAL-TAE Dumps Real Exam Questions Test Engine Dumps Training: https://www.dumpsking.com/CTAL-TAE-testking-dumps.html
CTAL-TAE exam dumps and online Test Engine: https://drive.google.com/open?id=1_xkAdGQnJO-AZJdEvlHwexDnnEQ1pRD_
