[Mar-2022] SAP C-TS422-2020 Exam Practice Test Questions - DumpsKing
Updated Certification Exam C-TS422-2020 Dumps - Practice Test Questions
C-TS422-2020 Exam Certification Details:
| Exam: | 80 questions |
| Level: | Associate |
| Cut Score: | 56% |
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Introduction to SAP S/4HANA Supply Chain Planning | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Material Requirements Planning in SAP S/4HANA | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
NEW QUESTION 73
Which material master setting is required to use the repetitive planning table for production with production orders?
- A. At least one valid production version must exist on the MRP4 view
- B. An overall profile be assigned on the Work Scheduling view
- C. The Selection Method must be set to "2 Selection by production version".
- D. A repetitive manufacturing profile must be assigned on the MRP4 view
Answer: D
NEW QUESTION 74
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning at assembly level (70)
- B. Planning without final assembly (50)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: B
NEW QUESTION 75
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Setup time
- C. Float after production
- D. Total replenishment lead time
Answer: A,C
NEW QUESTION 76
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. BOM, in the item for the material
- C. Material master of the finished product
- D. Work center, in the production supply area
Answer: B,D
NEW QUESTION 77
A planner updated a production order status from partially confirmed "PCNF"to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
- A. The production manager can still see the capacity requirements
- B. The production operator cannot enter additional confirmations
- C. The buyer can still see component reservations
- D. The warehouse clerk still carry out goods issue transactions
Answer: B
NEW QUESTION 78
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Actual cost calculation
- B. Order type determination
- C. Planning selection
- D. Master data selection
- E. Capacity requirements determination
Answer: B,D,E
NEW QUESTION 79
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up to the safety stock level
- B. Fill up to the maximum stock level
- C. Fill up to the reorder stock level
- D. Fill up based on the lot size procedure
Answer: D
NEW QUESTION 80
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.
- A. Order list
- B. Production list
- C. Resource utilization
- D. Resource overview
Answer: A,C
NEW QUESTION 81
When do you use variant bills of materials (BOMs)?
- A. When multiple master also have the same BOM
- B. When multiple master also have similar BOMs
- C. When a material has multiple BOMs
- D. When a material has a configurable BOM
Answer: A
NEW QUESTION 82
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.
- A. Monitor Production Orders Fiori app
- B. Material Coverage Fiori app
- C. Flow manufacturing
- D. Lock-free inventory movements
- E. Rough-cut capacity planning
Answer: A,B,D
NEW QUESTION 83
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Picking list
- B. Transfer Order
- C. Kanban
- D. Backflushing
Answer: A
NEW QUESTION 84
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.
- A. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- B. It is used by product costing to determine how costs are rolled up.
- C. It is used by ATP to determine the priority of alternative components.
- D. It is used in MRP to determine the sequence in which materials are planned.
Answer: B,D
NEW QUESTION 85
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Group
- C. Plant Data
- D. MRP Controller
Answer: B
NEW QUESTION 86
Which task list types can have parallel sequences? There are 2 correct answers to this question.
- A. Rate routings (R)
- B. Reference operation sets (S)
- C. Master recipes (2)
- D. Routings (N)
Answer: A,D
NEW QUESTION 87
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- B. Add the agreement to the quota arrangement and mark it for MRP relevance.
- C. Add the agreement to the source list and mark itfor MRP relevance.
- D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Answer: A,C
NEW QUESTION 88
......
Updated Verified C-TS422-2020 dumps Q&As - Pass Guarantee or Full Refund: https://www.dumpsking.com/C-TS422-2020-testking-dumps.html
C-TS422-2020 PDF Questions and Testing Engine With 150 Questions: https://drive.google.com/open?id=1s1Bieh6obsOZxH3YIX1Nx_nNb0BMK47p