C_TS422_2020 Training & Certification Get Latest SAP Certified Application Associate Updated on Sep 08, 2021
Certification Training for C_TS422_2020 Exam Dumps Test Engine
NEW QUESTION 34
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a production order.
- B. It is converted into a planned order.
- C. It is converted into a reservation.
- D. It is converted into a schedule line.
Answer: C
NEW QUESTION 35
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Controller
- C. MRP Group
- D. MRP Profile
Answer: C
NEW QUESTION 36
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Minimum wait time
- B. Production time
- C. Goods receipt processing time
- D. Queue time
Answer: D
NEW QUESTION 37
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Alphanumeric or quota arrangement
- B. Lot size or material cost
- C. Planned order or materialnumber
- D. Validity period or sales order
Answer: A
NEW QUESTION 38
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with more than one work center
- B. A production line with prioritized alternative work centers
- C. A production line with an alternative sequence in the routing
- D. A production line with a parallel sequence in the routing
Answer: A
NEW QUESTION 39
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
- A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
- B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
- C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
- D. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
Answer: B
NEW QUESTION 40
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Individualconversion
- B. Partial conversion
- C. Order release
- D. Full conversion
Answer: B,D
NEW QUESTION 41
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 42
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Work center hierarchy
- B. Operation network
- C. Resource network
- D. Setup matrix
Answer: A
NEW QUESTION 43
For what production type are production orders used?
- A. Process manufacturing processes
- B. Period and quantity-oriented production
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
Answer: C
NEW QUESTION 44
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To provide timely updates of inventory management for the staged components
- C. To stage different components for a production line simultaneously
- D. To reduce the totalproduction lead time for along production line
Answer: A,B
NEW QUESTION 45
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP planning file
- B. MRP controller
- C. MRP group
- D. MRP type
Answer: B
NEW QUESTION 46
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past procurement quantities
- B. Past quotation quantities
- C. One-off events
- D. Past sales order quantities
- E. Market intelligence
Answer: C,D,E
NEW QUESTION 47
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Make-to-stock production (10)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
Answer: A
NEW QUESTION 48
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Production supply area
- C. Rate routing
- D. Replenishment strategy
Answer: A
NEW QUESTION 49
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Whether a material master fieldis required, changeable, displayed, or hidden
- B. Which material master views can be maintained
- C. Whether material numbers are assigned internally or externally
- D. Which transaction you can use to create a new material
Answer: A,B
NEW QUESTION 50
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Continuous flow materials
- B. Co-products
- C. Waste products
- D. By-products
- E. Bulk materials
Answer: B,C,D
NEW QUESTION 51
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.
- A. Lot size
- B. Purchase orders
- C. Maximum stock level
- D. Safety stock
Answer: A,D
NEW QUESTION 52
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When the MRP results are saved
- B. When you create a sales order
- C. When you create a planned order
- D. When you deliver a sales order
Answer: B
NEW QUESTION 53
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
Answer: C
NEW QUESTION 54
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Concur
- B. SAP Ariba
- C. SAP C/4HANA
- D. SAP Field glass
- E. SAP SuccessFactors
Answer: A,B,D
NEW QUESTION 55
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?
- A. Production order release
- B. Kanban
- C. Back flushing
- D. Material requirements planning
Answer: D
NEW QUESTION 56
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You can reschedule the operation using lead the scheduling.
- B. You canreschedule the order using material requirements planning.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the order using lead time scheduling.
Answer: C
NEW QUESTION 57
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- C. An evaluation that is ordered according to thebill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
Answer: C
NEW QUESTION 58
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Supply Network Planning (SNP)
- B. Capacity Requirements Planning (CRP)
- C. Material Requirements Planning (MRP)
- D. Demand Planning (DP)
Answer: C
NEW QUESTION 59
......