NEW QUESTION # 19
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. During conversion, SUM deelivers some business functions already activated.
  • B. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • C. Activate the required business functions manually in the production system.
  • D. Import a transport request from the development system that contains the reccording of the activation.

Answer: A,D


NEW QUESTION # 20
Which of the following SUM activitiies require a stack XML file calculated by the mainteenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion inncluding DMO
  • B. Prerequisite check
  • C. SAP S/4HANA conversion without DMO
  • D. DMO without system update
  • E. Benchmark tool

Answer: A,B,C


NEW QUESTION # 21
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for thee last time?

  • A. Early in the downtime
  • B. As part of the cleanup process
  • C. At the end of the downtimee
  • D. Before the downtime startss

Answer: D


NEW QUESTION # 22
How does SUM recognize modificattion adjustment transports from predecessor systemms?

  • A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • B. By searching for transport requests that are assigned to project SAP ADJUST
  • C. By searching for transport requests named <sid>KO<number>
  • D. By searching for transport requests in file umodauto.lst

Answer: D


NEW QUESTION # 23
You performed a custom code checck for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.

  • A. SAT(Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. ATC (ABAP Test Cockpit)
  • D. SE80 (Object Navigator)

Answer: C,D


NEW QUESTION # 24
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check logs for jobs starting with RSUPG SGEN in the SAP system.
  • B. Check the Charts Control Ceenter in the SUM UL
  • C. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
  • D. Check the log files written in the SUM directory, subdirectory abap, subdirectory log

Answer: B,D


NEW QUESTION # 25
You are performing an SAP S/4HANA conversion with DMO. You entered a specific nummber of R3load processes during the Extraction Roaadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this questiion.

  • A. In DMO Migration Preparattion
  • B. In SUM Parameters
  • C. In Process Control Center
  • D. In SUM Analysis

Answer: B,C


NEW QUESTION # 26
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Install add-on SAP Gatewayy 7.50.
  • B. Delete client 066 (Early-Waatch client).
  • C. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
  • D. Perform the custom code adjustment.

Answer: B,C


NEW QUESTION # 27
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can obtain migration duration files from a previous benchmark run that caan be used to optimize the next runs.
  • B. You can verify that the conttent of the download directory matches the stackXMML file.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can find the optimal nuumber of parallel R3load processes by monitoring hoost performance.

Answer: A,D


NEW QUESTION # 28
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

  • A. Migration Hub
  • B. Central Instance
  • C. Transition Server
  • D. Migration Server

Answer: D


NEW QUESTION # 29
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks muust be performed during the preparation phase?

  • A. Solve problems from the si mplification item (SI) checks.
  • B. Run the database migrationn to the SAP HANA database.
  • C. Check the compatibility of custom code with SAP S/4HANA.
  • D. Perform the migration of data to the new data structure.

Answer: C


NEW QUESTION # 30
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.
Which steps run before the beginniing of the technical downtime, irrespective of your SUM configuration? Note: There are 3 coorrect answers to this question.

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Generation of the new ABAAP loads in phase RUN_SGEN_GENERB
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Creation of application tablles in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATTE
  • E. Import of upgrade and langguage data from the download directory in phase TAABIM UPG

Answer: A,C,E


NEW QUESTION # 31
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • B. Without table contents commparison, only 40 R3load processes are being started.
  • C. SUM is still running in uptimme; the 40 defined R3load processes are considered.
  • D. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.

Answer: A


NEW QUESTION # 32
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Software update
  • B. Database migration
  • C. Custom code analysis
  • D. Unicode conversion

Answer: A,B


NEW QUESTION # 33
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU IMPORT ALL
  • B. EU CLONE MIG_DT_RUN
  • C. EU_CLONE MIG SOT RUN
  • D. EU_CLONE MIG_DT_CREATTE

Answer: B


NEW QUESTION # 34
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?

  • A. The path was stored to the environment of user <sid>adm during registration.
  • B. The path is taken from the URL entered in the browser to start SUM.
  • C. The path was stored in file host profile during registration.
  • D. The path was stored in file sumabap.conf during registration.

Answer: D


NEW QUESTION # 35
......

Authentic Best resources for E_S4CON_2025 Online Practice Exam: https://www.dumpsking.com/E_S4CON_2025-testking-dumps.html